All subjects
Biomethane/RNG

Bright Renewables to provide biogas upgrader to Spain

Bright Renewables to provide biogas upgrader to Spain
A Bright Biomethane biogas upgrader.

Bright Renewables, the biogas upgrading arm of the Netherlands-headed bioenergy specialists HoSt has announced has been contracted to develop and deliver a biogas upgrading system at a waste management plant in Murcia, Spain.

An error occurred

You are logged in as subsbriber at Bioenergy International, but something is wrong.

On your profile you can see what subscriptions you have access to and more information.

Is some of the information wrong – please contact our customer service.

Please reload the page

We could not ascertain if you are logged in or not. Please reload this page.
Bioenergy International premium

Do you want to read the whole article?

Only logged in payed subscribers can read all contents on bioenergyinternational.com
As an subscriber you get:
  • Six editions per year
  • Full access to all digital content
  • The E-magazine Bioenergy international
  • And more ...

The biogas stream comes from the biogas facility at a waste management plant in Murcia, and the biogas upgrader converts 400 Nm3/h of biogas into 154 Nm3/h of biomethane aka renewable natural gas (RNG).

The produced biomethane will be used for grid injection. Currently, Bright is developing multiple projects in Spain.

Biogas upgrading technology plays an important role in increasing sustainability. Biogas upgrading systems increase the availability of renewable natural gas, while simultaneously reducing Spain’s dependency on natural gases. The potential in the Spanish renewable energy market is substantial and Bright has multiple projects in the pipeline. We are eager to develop this project and make it a successful one, said Orgita Gjonca, Area Sales Manager at Bright Renewables.

Membrane separation technology

At the biogas production facility, the biogas will be upgraded to biomethane using membrane biogas upgrading technology.

The biogas upgrader, PurePac Compact, has a capacity of 400 Nm3/h and will be extended in the future to a maximum capacity of 700 Nm3/h.

At the moment, the Murcia project is in the construction phase and commissioning will begin in February 2023. The first gas-to-grid is planned shortly after.

Prefab system

To ensure a quick process, Bright develops the technology off-site, making the technology a containerized prefabricated design for plug & play installation on-site with a quick start-up.

The design and patented control system make it possible to inject specification-compliant biomethane into the grid within a few minutes of start-up.

No water or chemicals are needed in the process which means that there are no disposal problems, such as acid water or chemicals.

It’s fantastic to deliver and develop the technology to convert waste into renewable energy and at the same time the waste management plant takes a step forward to sustainability, ended Orgita Gjonca.

Most read on Bioenergy International

Get the latest news about Bioenergy

Subscribe for free to our newsletter
Sending request
I accept that Bioenergy International stores and handles my information.
Read more about our integritypolicy here